Installation; Unpacking And Start-Up - 4titude 4s2 Manual

Variable temperature thermal sealer
Hide thumbs Also See for 4s2:
Table of Contents

Advertisement

3

INSTALLATION

3.1 Unpacking and Start-Up

After unpacking retain all packing material and fixtures, as the unit must
always be transported in its original packaging to avoid damage.
The manufacturer accepts no responsibility for damage incurred unless
the unit is correctly packed and transported in this way.
Remove the 4s2 unit from its packaging. Open the sealing drawer and
remove the protective cardboard.
The unit has to be placed on a level surface, away from direct sunlight
ensuring access to the power switch at the back of the unit.
Ensure that the vents on the casing are not obstructed.
The mains voltage selector switch should be checked to ensure that the
voltage has been set at the correct value.
Connect the unit to the mains power supply and switch on the switch I/O
of the rear power interface.
If the heater within the unit is receiving power the amber LED on the
control panel will be illuminated.
After switching on wait until the amber LED light stops flashing (the set
temperature is reached and the unit is ready to seal).
4titude Ltd, The North Barn, Surrey Hills Business Park, Damphurst Lane, Wotton, Dorking, Surrey, RH5 6QT, UK
Tel: +44 (0) 1306 884885 Fax: +44 (0) 1306 884886 info@4ti.co.uk www.4ti.co.uk
Page | 15

Advertisement

Table of Contents
loading

Table of Contents