Download Print this page
Mercia Garden Products 10DTDRK0806-V2 General Instructions Manual

Mercia Garden Products 10DTDRK0806-V2 General Instructions Manual

Staffordshire

Advertisement

Quick Links

General Instructions
10DTDRK0806-V2
Sta ordshire
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips
screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
LOCATION FOR YOUR GARDEN BUILDING
A minimum of 60cm should be left around the perimeter of your garden building to allow access for
maintenance, annual treatment and to allow air ow around the building.
Where possible you should avoid placing your garden building underneath large trees to prevent the tree
causing damage to the building.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of
heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also
occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be
avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended
periods of warm sunshine and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to
prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guaran-
tee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof
treatment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The
cladding should overlap the base, creating a run o for water. It is also recommended that the oor be at
least 25mm above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of
childrens products independently tested to EN71 level, we cannot accept responsibility for your safety
whilst erecting or using this product.
Please retain product label and instructions for future reference
x2
All buildings should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been dip treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building has been treated by the
correct application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
REGISTER FOR YOUR
ANTI-ROT
GUARANTEE TODAY
For assistance please contact customer care on: 01636 821215
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
It is advisable to use a hand
saw when cutting roof and
oor boards.
PLEASE SCAN HERE:
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 10DTDRK0806-V2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 10DTDRK0806-V2

  • Page 1 It is also recommended that the oor be at least 25mm above the surrounding ground level to avoid ooding. For assistance please contact customer care on: 01636 821215 Mercia Garden Products Limited, TYPES OF BASE Sutton On Trent, - Concrete 75mm laid on top of 75mm hard-core.
  • Page 2 10DTDRK0806-V2 Please retain product label and instructions for future reference 0806 (Pack A) 0806 (Pack B extension) Front Gable QTY 1 6” T-Hinge QTY 7 AI-10DRKFG1808x417 PI-07-0082 OSB Roof Sheet QTY 4 PI-03-0374 Finial QTY 2 L Bracket QTY 4...
  • Page 3 Please retain product label and instructions for future reference Image of 0806 + extension Nail Bag There may be extra screws present in the nail bag 0806 -Extension Pack Purchased Pack B parts Pack A Pack B Ridge Bar - 27x70x630mm F2770-630mm 30mm screws x 14 30mm screws x 138...
  • Page 4 Please retain product label and instructions for future reference Step 1 Step 3 Construct the base bearers using 2x (No. Place the second side panel (No. 2) onto 20 & No. 21). This will create the base for the base framing and x together to the the Dog Kennel.
  • Page 5 Please retain product label and instructions for future reference Step 5 Step 7 *If you have purchased an extension pack Fix the mesh Panels (No. 6) into position B then skip to pack B step 1a . and secure with 4x50mm screws per panel, making sure you screw from the Place the remaining bearers (No.
  • Page 6 Please retain product label and instructions for future reference Step 9 Step 11 Use the ridge bars (No. 19 & No. 22) to Fix the assembled roof panels to the position the L brackets (No. 14) marking building with 12x30mm screws per roof a line with a pencil.
  • Page 7 Please retain product label and instructions for future reference Step 13 Step 15 Fix the 4x T Hinges (No.12) onto the doors (No. 7 & 8) and door frame as Fix the cover trims (No. 24) to the corners shown with 7x30mm screws. of the building Fix the turn button (No.15) to one of the with 4x30mm screws.
  • Page 8 Please retain product label and instructions for future reference Step 17 Step 19 Attach the fascias (No. 18) to the front Finally, slot the ooring (No. 9) into the and rear of the building with 4x40mm dog run. screws per fascia. Once in place, cut of the excess material of the fascia with a hand saw.
  • Page 9 Please retain product label and instructions for future reference Pack B Step 1a Step 3a Place the Base bearers (No. 21, 25 & 36) Fix the mesh Panels (No. 4) into position into position and secure to each with and secure with 4x50mm screws per 2x70mm screws.
  • Page 10 Please retain product label and instructions for future reference Step 6a Step 4a Use the ridge bars (No. 19, No. 33 & No. Fix the mesh Panels (No. 6) into position 22) to position the L brackets (No. 14) and secure with 4x50mm screws per marking with a pencil.
  • Page 11 Please retain product label and instructions for future reference Step 8a Step 10a Fix the Eaves Frames (No. 23) to the Fix the building to the Base Framing longest side of the (No. 11) roof OSB. using 50mm screws evenly spaced inside Fix eaves frame (No.
  • Page 12 Please retain product label and instructions for future reference Step 12a Step 14a Fix the T Hinges (No.12) onto the doors Cut the Felt (No. 28, 29 ) into 3 sheets and lay (No. 7 & 8) and door frame as shown with onto the roof.
  • Page 13 Please retain product label and instructions for future reference Step 17a Step 16a Finally, slot the ooring (No. 9) into the Fix the 3x T hinges (No. 12) onto the door dog run. (No. 6) and door frame as shown in the previous diagram.
  • Page 15 REGISTER FOR YOUR PLEASE SCAN HERE: ANTI-ROT GUARANTEE TODAY...