Page 3
Please retain product label and instructions for future reference Step 2 Step 4 Place the oor panels (No. Using the same method outlined 5) onto a rm & level base, in Step 3, x the plain sides (No. 4) & the door gable (No. 1) using ensure the base has suitable drainage free from 12x50mm screws.
Page 4
Please retain product label and instructions for future reference Step 8 Step 6 Attach the cover trims (No. 14) to the Once the roof is xed, building using 3x40mm secure the building to the oor with 24x50mm screws. screws per strip. 18x40mm Screws * Ensure to screw in alignment with the oor bearers.
Page 5
Please retain product label and instructions for future reference Step 10 Step 12- Follow EITHER the opening window or xed window step. To x the lock in place, screw the Staple (No. 21) to the Door Gable or Slave door. Opening Window Place the window trim (No.
Please retain product label and instructions for future reference Step 13 Fix the casement stay (No. 23) to the window and then align the xings to the window panel framing. Ensure the casement stay ts onto the xings when closed before securing in place.
Need help?
Do you have a question about the GROUNDSMAN 10 X 8 and is the answer not in the manual?
Questions and answers