Immergas HERCULES Solar 26 1 A Instruction Booklet And Warning page 130

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 125
1.8 INSTALLATION OF THE AIR
INTAKE AND FLUE EXHAUST
PL
TERMINALS.
• Type C configuration, sealed chamber and
fan assisted.
CZ
Horizontal intake kits - exhaust Ø 60/100. Kit
assembly (Fig. 1-11): install the bend with flange
(2) on the most internal hole of the boiler, placing
the gasket (1) (which does not require lubrication);
HU
positioning it with the circular projections
downwards in contact with the boiler flange
and tighten using the screws present in the kit.
Fit the Ø 60/100 (3) concentric terminal pipe
RO
with the male end (smooth) to the female end
of the bend (2) up to the stop; making sure that
the internal and external wall sealing plate have
been fitted, this will ensure sealing and joining
IE
of the elements making up the kit.
N.B.: for correct functioning of the system the
terminal with grid must be installed correctly
SK
ensuring that, the "high" indication present on
the terminal is respected on installation.
• Coupling extension pipes and concentric
elbows Ø 60/100. To push-fit extensions with
other elements of the flue extraction elements,
operate as follows Install the concentric pipe
or elbow with the male side (smooth) on the
female section (with lip seal) to the end stop
on the previously installed element. This will
ensure sealing and joining of the elements
correctly.
C13
2
1
C33
5
4
3
2
1
128
The kit Ø 60/100 can be installed with the rear,
right side, left side or front outlet.
• Extensions for horizontal kit. The horizontal
intake-exhaust kit Ø 60/100 can be extended
up to a max. horizontal distance of 12.9 m in-
cluding the terminal with grid and excluding
the concentric bend leaving the boiler. This
configuration corresponds to a resistance factor
of 100. In these cases the special extensions
must be requested.
N.B.: when installing the pipes, a section clamp
with pin must be installed every 3 metres.
• External grill. N.B.: for safety purposes, do not
even temporarily obstruct the boiler intake-
exhaust terminal.
Vertical kit with aluminium tile Ø 60/100.
Kit assembly (Fig. 1-14): install the concentric
flange (2) on the most internal hole of the
boiler, positioning the gasket (1) (which does not
require lubrication); with the circular projections
downwards in contact with the boiler flange and
tighten using the screws present in the kit.
Imitation aluminium tile installation: replace the
tile with the aluminium sheet (4), shaping it to
ensure that rainwater runs off. Position the fixed
half-shell (6) and insert the intake-exhaust pipe
(5). Fit the Ø 60/100 (3) concentric terminal pipe
with the male end (5) (smooth) into the flange (2)
up to the stop; making sure that the wall sealing
plate has been fitted (3), this will ensure sealing
and joining of the elements making up the kit.
3
4
5
The kit includes:
N° 1 - Gasket (1)
N° 1 - Concentric bend Ø 60/100 (2)
N° 1 - Int./exhaust concentric terminal
Ø 60/100 (3)
N° 1 - Internal white wall sealing plate
(4)
N° 1 - External grey wall sealing plate (5)
The kit includes:
7
N° 1 - Gasket (1)
6
N° 1 - Female concentric flange
(2)
N° 1 - Wall sealing plate (3)
N° 1 - Aluminium tile (4)
N° 1 - Int./exhaust concentric
terminal Ø 60/100 (5)
N° 1 - Fixed half-shell (6)
N° 1 - Mobile half-shell (7)
Fig. 1-11
Fig. 1-14
• Coupling extension pipes and concentric
elbows. To install push-fitting extensions
with other elements of the flue extraction
elements assembly, proceed as follows: Install
the concentric pipe or elbow with the male
side (smooth) on the female section (with lip
seal) to the end stop on the previously installed
element. This will ensure sealing and joining of
the elements correctly.
Important: if the exhaust terminal and/or exten-
sion concentric pipe needs shortening, consider
that the internal duct must always protrude by 5
mm with respect to the external duct.
This specific terminal enables flue exhaust and
air intake, necessary for combustion, in a verti-
cal direction.
C13
Fig. 1-12
C33
Fig. 1-15