Hot Water Faucet Installation Instructions - Fetco TBS-2111 User’s Manual & Operator Instructions

Hot tea brewer extractor touch screen m
Table of Contents

Advertisement

Hot water faucet installation instructions

Hot water service faucet, if required by operator, is installed before initial set-up
TBS-2111XTS is supplied with part number 1000.00109.00 hot water faucet accessory set.
 Professional installation is required. Do not connect water or electrical utilities before installing.
2) Remove the 16mm/5/8" round plug from the enclosure
Select either the left or right side-(left side shown)
3) From outside of brewer-Install faucet assembly
4) From inside of brewer-Thread jam nut on faucet stub.
5) Tighten jam nut firmly against enclosure wall
6) Locate plugged hot water supply silicone tube.
7) Remove plug from hot water supply silicone tube
8) Place clamp 2-3 inches from open tube end as shown
9) Push open end of silicone tube over faucet stub
10) Slide clamp over tube and secure. Tube and clamp must be secure
11) Fill brewer and test faucet-check for leaks and reinstall top cover
____________________________________________________________________________________
Configurable Dispenser Locator
Factory configured for 7 inch dispenser
To Configure for wider dispensers:
Remove screw and 7 inch adapter as shown
Go to fetco.com for the latest versions of all information
1) Remove top cover-as shown 
Slide clamp
to secure
Page 23
User Guide & Operator instructions
Remove top cover
Remove 16mm/5/8"
round plug from left
or right side
P152 rev.003 August 2021

Advertisement

Table of Contents
loading

Table of Contents