Fetco CBS-2152XTS-2G Users Manual And Operator Instructions

Fetco CBS-2152XTS-2G Users Manual And Operator Instructions

Hot beverage brewers

Advertisement

Quick Links

®
FETCO Models:
CBS-2151
Commercial Hot Beverage Equipment
Contact Information........................................................ 2
Description & Features .................................................. 2
Factory settings.............................................................. 2
Layout of the brewer ...................................................... 3
Operating Instructions.................................................... 4
Menu Features: Batch Parameters................................ 7
How to calibrate the flow rate....................................... 11
© 2014-2015 Food Equipment Technologies Company
User's Guide, Operator Instructions and Access
CBS-2152
XTS
6-liter/1 ½ -gallon
hot beverage brewers

Table of Contents

NOTICE TO INSTALLER: Please leave this book with the machine.
CBS-2152-2
XTS
7.3-liter-2gallon
Operator Training .........................................................14
Safety Notes .................................................................13
Error Codes ..................................................................13
Installation Directions ...................................................16
Final Setup for Startup..................................................22
Parts and Wiring Diagrams ..........................................24
Brewbaskets .................................................................24
.
XTS
May 2015
P129 rev 002

Advertisement

Table of Contents
loading

Summary of Contents for Fetco CBS-2152XTS-2G

  • Page 1: Table Of Contents

    User’s Guide, Operator Instructions and Access ® FETCO Models: CBS-2151 CBS-2152 CBS-2152-2 6-liter/1 ½ -gallon 7.3-liter-2gallon hot beverage brewers Commercial Hot Beverage Equipment Table of Contents Contact Information............2 Operator Training ............14 Description & Features ..........2 Safety Notes ..............13 Factory settings..............
  • Page 2: Contact Information

    Sales (North Americas): sales@fetco.com Phone: (847) 719-3000 Sales (International): international@fetco.com Toll Free: (800)FETCO.99 or (800) 338-2699 Internet: www.fetco.com Description & Features CBS-2150XTS Series coffee brewers feature universal spray over technology from the Cascading Spray Dome™. The following variables are programmed for each batch size:...
  • Page 3: Accessing Equipment And Control Screens

    Accessing equipment and control screens Layout of the brewer Touch-screen for brewer operation Brew basket sensor (internal) SD card interface port (Load & Save) Hot Water Faucet Airpot or Dispenser Locator (Two for dual side) Main power switch Slide out back panel for service access Accessing batch and programming menu screens Regular 1.50...
  • Page 4: Operating Instructions

    Quick brewer setup NOTES Install plumbing and electrical utilities -See Installation Section in this guide Turn rear power switch “ON” -Located on back, lower right side Brewer hot water tank will fill in 4-8 minutes ▪ -Ready screen will display ” FILLING”...
  • Page 5 Brewing-shown by touchscreen Brewer screens displayed for brewing NOTES CBS-2151XTS CBS-2152XTS SINGLE SIDE TWIN SIDE Note: There are three ™ ™ EXTRACTOR EXTRACTOR “BREW AT TEMPERATURE DEFINITONS”. “READY SCREEN” TOUCHSCREEN TOUCHSCREEN CBS_2131 3L CBS_2132 3L Tap screen to display menus The “Brew At Temperature ”—“ON”...
  • Page 6: Programming- Operator Access Programming

    Programming- operator access programming -The FETCO CBS-2150XTS brewers have four brew batch menus per side. Menus are preprogrammed by the factory with basic settings that will operate the equipment as purchased. There are two batches each marked “Regular” and two marked “Decaf”...
  • Page 7: Menu Features: Batch Parameters

    Menu Features: Batch Parameters PROGRAM Programming Items Factory set Default Programming Range Notes Batch 1 LEFT* • Batch Summary Display Summary Choose from list: (Regular 1-16) • Batch Name Regular 1(-16) Regular1 -OR- Write: any name 1.5 gal CBS-2151& 2152XTS 1.50 gal •...
  • Page 8 Tap the screen, ECO Mode turns off, and the brewer will heat to set temperature. It takes approximately 7-15 minutes to return from 60°C/170°F to factory default 93°C/200°F ■ All FETCO commercial hot beverage equipment have well insulated hot water tanks and have engineered mechanical features to limit energy consumption Heating °C...
  • Page 9 Programming Factory set Programming Range INPUTS Notes Items Default (display) R. Brew Basket Sens. [ single/dual] L. Brew Basket Sens. H. Liquid Level probe • Input Summery Display Inputs H. Tank Temperature Probe L. Tank Temperature Probe SD Card Recognized Tank Temp.
  • Page 10 Programming Factory set Programming Range OUTPUTS Notes Items Default (display) 3400 Left Brew FR 2400 Left Bypass FR 3400 Right Brew FR 2400 Show Summary • Right Bypass FR FR=Flow Rate ml/min Output Summary Screen Contrast Screen Brightness Touch To Return TEST Runs valve to verify Left Valve...
  • Page 11: How To Calibrate The Flow Rate

    For factory or qualified service professional use only How to calibrate the flow rate Set the flow rates of components to adjust for taste profile and for over or under potting. Built-in algorithms in Brewer controller software corrects brew parameter to customer preferences or to trim variations in flow control components NOTICE: This operation requires operator hold finger on keypad position for one minute—without lifting it.
  • Page 12 Programming Factory set Programming Range OTHER Notes Items Default (display) See Error Code Chart Error Codes • Display Errors (Codes) for references Reset !!Errors must be • Reset Errors (Reset) |_______________[]____| corrected and cleared!! Setup upload Brewer --------------------------------------------------------------------------- Copy Program •...
  • Page 13: Safety Notes

    5. Do not attempt to move hot beverage equipment once it is filled. Drain equipment before moving. 6. FETCO commercial coffee brewers prepare large amounts of coffee or tea in a single batch using very hot water 7. Commercial coffee brewers provides very hot water from the sprayhead, brewbasket and faucet when it is pulled.
  • Page 14: Operator Training

    Operator Training Review the operating procedures with whoever will be using the brewer. Pay particular attention to the following areas: 1. Always pre-heat the dispensers before the first use of each day by filling them half way with hot water, and letting them stand for at least 5 minutes.
  • Page 15: Service Guide To A Successful Installation

    3. Verify voltages, polarity, circuits, and circuit breaker access before attaching equipment. 4. The electrical diagram is located in the Users Guide and online at www.fetco.com. 5. Make sure of the tight grounding of the equipment and use the external ground bolt.
  • Page 16: Installation Directions

    General: Utilize only qualified beverage equipment service technicians for installation. A Service Company Directory may be found on our web site, http://www.fetco.com. Water Connection 1. This equipment is to be installed to comply with the applicable federal, state, or local plumbing codes.
  • Page 17 Electrical-General 1. All FETCO brewers require Ground. Installation without ground may cause a hazard. 2. The electrical diagram with universal wiring instructions is located on the inside of the lower cover. 3. The installation must comply with applicable federal, state, and local codes having jurisdiction at your location.
  • Page 18: Cbs-2150Xts Dimensions & Utility Connections

    Technical Data—CBS-2150XTS 1½ gallon single and dual brewers Capacities & Measurements for single and dual brewers CBS-2150XTS Dimensions & Utility Connections CBS-2150XTS Rough-in Drawings Hot Water Total Weight- Empty Filled Shipping Shipping Brewer Height Width Depth Tank Brewer & Weight Weight Weight Dimensions...
  • Page 19 CBS_2151XTS—Single 1½ gallon version Electrical Configurations CBS_2151XTS—Single 1½ gallon version Electrical Configurations USA and Canada Configuration Code Heater Electrical Gallon/Hour Voltage Phase Wires Amp Draw Plastic Stainless Steel Configuration Connection (1½ gallon per batch Brewbasket Brewbasket E215151 E215151M 2 X 3.0 kW 208-240 Hardwired 4.6-6.1...
  • Page 20 CBS_2152XTS—Twin 1½ gallon version Electrical Configurations USA and Canada CBS_2152XTS—Twin 1½ gallon version Electrical Configurations Configuration Codes Heater Electrical Maximum Brew-Volume/Hour Voltage Phase Wires Plastic Stainless Steel Configuration Connection Amp Draw (1½ gallon per batch) Brewbasket Brewbasket E215251 E215251M 2 X 3.0 kW 208-240 Hardwired 4.6-6.1...
  • Page 21 Rough-in CBS-2152-2 gallon XTS —Dual station version NOTICE: This model uses 2 gallon dispensers CBS-2150XTS Utility Requirements Water Requirements: Inlet Water Temperature: Cold supply 20-75 psig (138-517kPa) 1½gpm/(5.7lpm) Coffee Filter Size: CBS-2150XTS: 15” X 5 ½ ” Cold Water Supply Only; Hardness >100 TDS (5.5 grain) Electrical: See electrical configuration chart Water inlet fitting is a 3/8 inch male flare.
  • Page 22: Final Setup For Startup

    EXTRACTOR SCREENS SHOWN TO THE RIGHT WILL APPEAR TOUCHSCREEN 4. The water tank will begin filling. FETCO Home Screen #1 will read “FILLING”. Ready Touch 5. When the water level rises and is sensed by the probe at the top of the tank the...
  • Page 23: Parts And Wiring Diagrams

    Parts and Wiring Diagrams 1102.00223.00 [Large] Spray Assembly Parts CBS-2150XTS PART NO DESCRIPTION 1102.00116.00 LARGESPRAY HOUSING ASSEMBLY 1102.00222.00 VALVE, BREW, ASSEMBLY, 24 VDC 1082.00056.00 SCREW, #8-11 X 1" THRD FORM, P/H PHIL 1102.00043.00 CASCADE SPRAY DOME ASSY, CBS-2050'S Valve rebuild kit 1000.00108.00 DSV 11 24 volt DC Valve rebuild kit contains: Silicone diaphragm...
  • Page 34 CBS-2152XTS...
  • Page 35 Bill of Materials CBS-2152XTS Part Number Name 1111.00046.00 WELDMENT BODY COMPLETE, CBS-2152 XTS 1111.00052.00 WELDMENT BODY COMPLETE, CBS-2152 XTS, 2 GAL 1071.00010.00 FAUCET HPSC-BR-8 REGULAR HANDLE 1031.00003.00 FITTING, BARB 3/8'ID x 1/4" FPT 1023.00147.00 PLUG, TANK SERVICE DRAIN FOR 18GA AND UP BODY 1057.00043.00 SOLENOID VALVE, SINGLE, 180 DEG, 240VDC 1083.00005.00...
  • Page 36 Drawing 1101.00214.00 CBS-2151XTS...
  • Page 37 Drawing 1101.00214.00 CBS-2151XTS CE Version Part Number Name 1111.00047.00 WELDMENT BODY COMPLETE, CBS-2151 XTS 1102.00223.00 SPRAY HOUSING, LARGE, COMPLETE ASSEMBLY, 24 VDC 1083.00010.00 WASHER, #10 SCREW W/NEOPRENE-BONDED SEAL 1084.00006.00 NUT, 8-32 18-8 HEX MACHINE SCREW 1102.00220.00 ASSEMBLY, BYPASS VALVE, RIGHT 1102.00113.00 SWITCH, REED, ASSEMBLY 1029.00006.00...
  • Page 38 TANK ASSY CBS-2152 XTS Part Number Name 1114.00091.00 WELDMENT, TANK CBS-2152 1024.00050.00 GROMMET, SILICONE, 11.4mm ID 1024.00062.00 GROMMET, SHORT, SILICONE, LEVEL AND TEMP PROBE 1024.00053.00 LEVEL AND TEMP PROBE GROMMET 1023.00166.00 FITTING, COLD WATER INLET, GROMMET DESIGN 1102.00161.00 PROBE ASSEMBLY, TEMP. AND LLC, HWD-2100 1112.00019.00 PROBE WELDMENT, WATER LEVEL 2.600"...
  • Page 39 TANK ASSY CBS-2151 XTS Drawing #1104.00061.00 Part Number Name 1114.00087.00 WELDMENT, TANK, CBS-2151 1024.00050.00 GROMMET, SILICONE, 11.4mm ID 1023.00166.00 FITTING, COLD WATER INLET, GROMMET DESIGN 1023.00168.00 FITTING, HOT WATER, GROMMET DESIGN 1023.00183.00 FITTING, DILUTION, TBS-2121 1023.00203.00 FITTING, BREW, GROMMET DESIGN 1024.00062.00 GROMMET, SHORT, SILICONE, LEVEL AND TEMP PROBE 1024.00053.00...
  • Page 40 BACK PANEL ASSEMBLY, CBS-2151XTS Drawing 1102.00231.00 Part Number Name 1112.00281.00 WELDMENT, BACK PANEL, CBS-2151 1052.00002.00 TERMINAL BLOCK, 3 POLE, W/ MARKING STRIP 1003.00170.00 BRACKET, GUARD 1083.00011.00 WASHER, #8 SCREW SIZE, INTERNAL TOOTH LOCK 1083.00016.00 WASHER, #8 SCREW SIZE, FLAT 1086.00008.00 CONNECTOR, CABLE CLAMP, 3/4"...
  • Page 41 BACK PANEL ASSEMBLY, CE CBS-2151XTS Drawing 1102.00216.00 Part Number Name 1112.00261.00 WELDMENT, BACK PANEL, CBS-2151, CE 1003.00170.00 BRACKET, GUARD 1081.00006.00 SPACER, 6MM OD x 3.2MM ID x 5MM LG, Z/P 1052.00001.00 POWER SUPPLY, 90-264VAC/24VDC, 1.8A 1029.00012.00 SPACER, .25" HEX X 1" LG, FEM #4-40 THREAD 1058.00024.00 SWITCH, POWER, DOUBLE POLE, 16A, 125/250 VAC 1086.00031.00...
  • Page 42 BACK PANEL ASSEMBLY, CBS-2152XTS Drawing 1102.00229.00 Part Number Name 1112.00280.00 WELDMENT BACK PANEL, CBS-2152 1052.00005.00 TERMINAL BLOCK TRACK 1083.00011.00 WASHER, #8 SCREW SIZE, INTERNAL TOOTH LOCK 1086.00008.00 CONNECTOR, CABLE CLAMP, 3/4" 1058.00020.00 SWITCH, PWR ROCKER RED, ILLUM. 250VAC 1084.00006.00 NUT, 8-32 18-8 HEX MACHINE SCREW 1044.00003.00 LABEL GROUND 1003.00170.00...
  • Page 43 BACK PANEL ASSEMBLY, CBS-2152XTS Drawing 1102.00229.00 1 1112.00267.00 WELDMENT, BACK COVER, CBS-2152, EU 1 1003.00170.00 BRACKET, GUARD 8 1081.00006.00 SPACER, 6MM OD x 3.2MM ID x 5MM LG, Z/P 1 1052.00001.00 POWER SUPPLY, 90-264VAC/24VDC, 1.8A 4 1029.00012.00 SPACER, .25" HEX X 1" LG, FEM #4-40 THREAD 1 1058.00024.00 SWITCH, POWER, DOUBLE POLE, 16A, 125/250 VAC 4 1083.00011.00...

This manual is also suitable for:

Cbs-2152xtsCbs-2152-2xtsCbs-2151xts

Table of Contents