Electrical Configurations & Brewing Capacities; Installation; Keys To A Successful Installation - Fetco TBS-21H User Manual

Iced tea brewing system
Table of Contents

Advertisement

Electrical Configurations & Brewing Capacities
Domestic
Heater
Model
Configuration
TBS-21H (-1)
1 X 1500 watt
TBS-21H (-2)
1 X 2100 watt
TBS-21H (-3)
1 X 2700 watt
TBS-21H (-5)
1 X 3700 watt
Heater
Export
Configuration
Model
TBS-21H (-4)
1 X 2700 watt
TBS-21H (-6)
1 X 3700 watt

Keys To A Successful Installation

FETCO brewers are rugged and reliable machines that will provide many years of service. However, if not
installed correctly by qualified personnel, the brewer will not operate properly and damage to the brewer may
result. Damages resulting from improper installation are not covered by the warranty.
Here are the key points to consider before installation:
General: Utilize a qualified beverage equipment service technician for installation.
Place the brewer on a level surface.
Do not adjust the thermostat setting unless absolutely necessary. It is set at the factory for optimum
performance- 205°F. It should only be lowered at high altitude installations.
Plumbing: This equipment is to be installed to comply with the applicable federal, state, or local plumbing codes.
The water line must be flushed thoroughly prior to connecting it to the brewer to prevent debris from
contaminating the machine.
A taste and odor filter is highly recommended for this and all beverage equipment
Verify that the water line will provide at least 2 gallons per minute before connecting it to the brewer.
Electrical: 120 volt units are supplied with appropriate cords and plugs for 15 amp or 20 amp service.
Dual voltage units (120/208-240VAC) are not supplied with a cord or plug. The terminals must be wired as
follows: L-1: 120 VAC
Both neutral (white) and ground (green) must be provided.
The electrical drawing is located inside the rear cover of the brewer.
Voltage
120
120
120/208
120/220
120/240
120/208
120/220
120/240
*Units with the optional green tea faucet: Add 0.3 KW and 2.5 amps to the figures shown.
Voltage
220
220
**Batches per hour are based on standard factory settings: Timer – 12 min. / Pulse – 10 seconds

Installation

Installation
Installation
Installation
(For Qualified Service Technicians Only)
L-2: neutral (white)
Phase
Wires
1 ph.
2 + ground
1 ph.
2 + ground
1 ph.
3 + ground
1 ph.
3 + ground
1 ph.
3 + ground
1 ph.
3 + ground
1 ph.
3 + ground
1 ph.
3 + ground
(Green tea faucet is not available on 120 volt or export versions.)
Phase
Wires
1 ph.
2 + ground
1 ph.
2 + ground
L-3: 120 VAC
3
Maximum
KW
Amp draw
1.6
13.0
2.2
18.0
2.1*
10.2*
2.4*
11.2*
2.8*
11.8*
2.9*
13.8*
3.3*
15.1*
3.8*
15.9*
Maximum
KW
Amp draw
2.4
11.2
3.3
15.1
ground (green)
Batches
per Hour**
2.3
2.6
2.6
2.7
2.8
2.8
2.9
3.0
Batches
per Hour**
2.7
2.9

Advertisement

Table of Contents
loading

Table of Contents