Setting At Work; Heating Phase - Cimbali M24 C Use And Installation

Table of Contents

Advertisement

"Before switching on the machine, ensure the
following:
The mains switch is on.
The water mains tap is open".
CAREFULLY PAY ATTENTION TO THE
SEQUENCE FOR ACTIVATING THE
SWITCHES (1) AND (1A).
Press the luminous main switch (1); the related indicator
light switches on. For DT versions, the key LEDs also light up.
If the water level in the boiler is lower than the minimum limit,
the boiler will be filled to the right level, indicated by restored
pressure in the manometer-pump.
ONLY AFTER the boiler filling process has been completed
should you press the light switch that activates the
resistance (1A); the related indicate light switches on and
the heating phase begins.
Place only coffee cups, cups and glasses to be used in
conjunction with the coffee machine on the cup-warming
plate.
Ensure that the coffee cups are completely drained before
placing them on the cup-warming plate.
No other objects shall be placed on the cup-warming plate
(11).
Press the button (12) and check to see that the light turns
on.
DT version. During heating, if one of the coffee dispensing
push buttons is pressed, the machine dispenses a coffee at
the temperature reached at the time.
C version. During heating, if one of the coffee dispensing
button (2) is pressed, the machine dispenses a coffee at the
temperature reached at the time.
Heating is completed when the boiler gauge indicator (14)
remains stable in the P green area.
The machine is now ready to dispense coffee, steam and hot
water.
DT version. To make sure that the dispenser unit and the
filter holder (10) are at similar temperatures, press the coffee
dispensing push button (18) and let the machine dispense
coffee for a few seconds. Then press again the push button
(18) to stop dispensing.
C version. To make sure that the dispenser unit and the
filter holder (10) are at similar temperatures, press the coffee
dispensing switches (2) and let the machine dispense coffee for
a few seconds. Then press the switch (2) to stop dispensing.
USE

6. Setting at work

Wait until the operating pressure (approx. 1.2 bar) appears
on the manometer (14).
At this point, the machine is ready for use.
7. Cup-Warmer (when provided)

8. Heating phase

27
11
DT
18
10
14
1
1a
ON
ON
12
ON
C
2
10
14
P

Advertisement

Table of Contents
loading

This manual is also suitable for:

M24 dt

Table of Contents