Chiller Uncrating (Apr 2021) - Q-Lab Q-SUN Xe-3 Series Quick Setup Manual

Xenon test chambers
Table of Contents

Advertisement

5.2 Chiller Uncrating (Apr 2021)

● For Q-SUN Xe-3 models with chiller (C), follow the instructions in this section to uncrate the chiller unit.
● Carefully read these instructions before uncrating the chiller.
● The tables below list chiller weights and tools needed for uncrating.
● Chillers are shipped in two types of crates
Weights
Shipping Weight (Approximate)
Tools Required
Phillips Screwdriver (Wooden Crate Only)
Pry Bar (Wooden Crate Only)
Band Cutter
Fork Lift*
* A fork lift or other mechanical lifting device is recommended for use in moving the
crated chiller to the installation location, and to lift the wooden frame in one piece
from the crate with wooden frame.
Figure 5.2.a: This Crate has a Carton Banded to a
Wooden Skid.
(Figure 5.2.a
On Skid With Wooden Crate
On Skid With Carton Only
Chiller Weight
and
Figure
5.2.b).
182 kg (400 lbs)
136 kg (300 lbs)
123 kg (270 lbs)
Flat Blade Screwdriver
Ratchet and 15 mm (9/16") Socket
Utility Knife
Figure 5.2.b: This Crate has a Wooden Frame
Surrounding the Carton.
Section 5. Setup
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents