Setup; Xe-3 Uncrating (Dec 2020) - Q-Lab Q-SUN Xe-3 Series Quick Setup Manual

Xenon test chambers
Table of Contents

Advertisement

Section 5. Setup

5. Setup

5.1 Xe-3 Uncrating (Dec 2020)

Carefully read these instructions before uncrating the tester.
Follow all local, OSHA, EHS, and other applicable equipment operation and
material handling safety requirements, recommendations, and practices.
● Q-SUN Xe-3 Testers are shipped in one of two types of crates
● Labels on the crate indicate the location of the instructions to be opened first
● Instructions for uncrating and setting up the tester are located in the envelope shown in
NOTE: Some images in this section show "E" models Xe-3 testers. Except where noted,
all information is exactly the same for non-"E" (Xe-3-H) testers.
Open First
Figure 5.1a: This Crate has a Carton Banded to a
Figure 5.1c: Labels on the crate indicate the envelope to
14
Wooden Skid.
be opened first.
(Figure 5.1a
and
Figure
(Figure
5.1c).
Open First
Figure 5.1b: This Crate has a Wooden Frame
Surrounding the Carton.
Figure 5.1d: Open this envelope for important uncrating
instructions.
5.1b).
Figure
5.1d.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents