Setting And Configuring The Terminal - ABB REL 505-C1 2.3 Series Installation And Commissioning Manual

Overcurrent protection terminal
Table of Contents

Advertisement

About this chapter
Chapter 8 Setting and
About this chapter
This chapter describes how to set the terminal, either through a PC or the local HMI,
and download a configuration to the terminal in order to make commissioning possible.
The chapter does not contain instructions on how to create a configuration or calculate
settings. Please consult the application manual for further information about how to cal-
culate settings.

Setting and configuring the terminal

configuring the
terminal
Chapter 8
41

Advertisement

Table of Contents
loading

Table of Contents