1
14
Receiving, unpacking and checking
Receiving, unpacking and checking
Procedure
1.
Remove the transport casing.
2.
Visually inspect the terminal.
3.
Check that all items are included in accordance with the de-
livery documents.
The user is requested to check that all software functions are in-
cluded according to the delivery documents after the terminal has
been energised.
4.
Check for transport damages.
In case of transport damage appropriate action must be taken
against the latest carrier and the nearest ABB office or representa-
tive should be informed. ABB should be notified immediately if
there are any discrepancies in relation to the delivery documents.
Store the terminal in the original transport casing in a dry and dust
free place, if the terminal is not to be installed or commissioned
immediately. Observe the environmental requirements stated in
the technical data.
Chapter 4
Unpacking and checking the
terminal