In-situ Aqua TROLL 600 Operator's Manual page 52

Hide thumbs Also See for Aqua TROLL 600:
Table of Contents

Advertisement

3 Press the button on the VuLink control panel.
Connecting to a cellular network can take up to 10 minutes in the following situations:
The first time VuLink powers up
When VuLink hasn't been powered up in several weeks or months
Pressing the button
starts the instrument
connection process.
Once linked to an
instrument, VuLink
attempts to connect to a
data network.
By default, VuLink reads all available parameters every hour and transmits to the cloud once
daily. You can also connect to the VuLink using the VuSitu Mobile App to configure a custom
log. See the VuLink manual for more infomation.
1-970-498-1500
All LEDs turn green for
one second. The battery
status LED changes
according to power level.
When the modem status
LED turns green, VuLink
begins connecting to
HydroVu. The data LED
blinks.
Next, the connection
status LED and Bluetooth
status LED blink.
All LEDs except the
Bluetooth status
indicator turn green.
58
The connection status
LED turns solid green,
indicating VuLink
is connected to an
instrument.
www.in-situ.com

Advertisement

Table of Contents
loading

Table of Contents