Pellet Feeder Connections; System Probe Connections - Nalco 3D TRASAR Series Installation And Operation Manual

Table of Contents

Advertisement

2.7.11 Pellet Feeder Connections

(User wired in Controller Box or Junction Box)
The pellet feeder is wired using the supplied pellet feeder
cable
(P/N
060-TR5311.88). The cable needs to be hardwired at the controller and connected to
the pellet feeder via the cable connector . The pellet feeder operates on 24 VDC, 0.5 amp, power .
Connection
Controller Box
Description
Board Reference
Pellet Feeder
Important: Pay close attention to orientation and placement of terminal block
!
for Pellet Feeder. Miswiring, or improperly placing the terminal on the
controller board could damage both pellet feeder and controller , which is not
coveed under warranty.

2.7.12 System Probe Connections

(Factory wired in Controller Box)
Probe wiring for the Fluorometer and Conductivity probe is done at the factory .
Probe
Description
Fluorometer
Conductivity
Technical Help
(630) 305-CHEM
Controller Box
Terminal
(Removable
Connector)
TB11
ISO Gnd
TB11
TB11
TB11
ISO Gnd
TB11
24V
Controller Box
Controller Box Terminal
Board Reference
(Removable Connector)
TB15
TB15
TB15
TB15
J7-1
J7-2
J7-3
J7-4
J7-5
J7-6
J7-7
J7-8
J7-9
521-OM0108.88
Copyright © 2009 Nalco Company
®
3D TRASAR
5500 - Installation & Operation Manual
Junction Box
Terminal
Gnd
B
B
A
A
Gnd
24V
A
B
Gnd
6V
Wht
Blk
Gnd
Red
Blk
Gnd
Grn
Blk
Gnd
Wiring
Wire Color
Blue with White stripe
Orange with White stripe
White with Orange stri pe
Black
White with Blue stripe
Wire Color
White with Orange stripe
Orange with White stripe
Blue with White stripe
White with Blue stripe
White
Black
Shield
Red
Black
Shield
Green
Black
Shield
2-43

Advertisement

Table of Contents
loading

Table of Contents