2.6.5 NCM Corrosion Probe Installation

The 3D TRASAR 5500 system is shipped with 1 mild
steel corrosion probe and 1 copper corrosion probe.
Corrosion monitoring is an available upgrade for 3D
TRASAR Starter 3500 systems.
IMPORTANT: Brass, CuNi 90/10, CuNi
70/30, aluminum, and galvanized steel
!
probes can be ordered separately . Refer
to the Appendix for part numbers.
Install the corrosion probes as follows:
STEP 1 -
Carefully unpack both corrosion probes and
locate the two probe restraints.
STEP 2 -
Attach the probe restraints to each probe. The ring portion of the restraint is installed
between the hex nut and the threaded portion of the swage fitting as shown below .
!
WARNING: The probe restraint must be installed on all 3D TRASAR units at all times.
Technical Help
(630) 305-CHEM
3D TRASAR
NCM Probe Restraint
P/N 400-NCMAC15.88
521-OM0108.88
Copyright © 2009 Nalco Company
®
5500 - Installation & Operation Manual
Install probes
Install probes
ORP Probe
Install probes and attach
Install probes and attach
connectors.
connectors as shown.
Tighten swage fitting fully.
2-30