Group 5 Swing Device - Hyundai R480LC-9S Service Manual

Crawler excavator
Table of Contents

Advertisement

GROUP 5 SWING DEVICE (TYPE 1)
1. REMOVAL AND INSTALL OF MOTOR
1)
REMOVAL
(1)
Lower the work equipment to the ground
and stop the engine.
(2)
Operate the control levers and pedals
several times to release the remaining
pressure in the hydraulic piping.
(3)
Loosen the breather slowly to release the
pressure inside the hydraulic tank.
Escaping fluid under pressure can pene-
trate the skin causing serious injury.
When pipes and hoses are disconnected,
the oil inside the piping will flow out, so
catch it in oil pan.
(4)
Disconnect hose assembly (2).
(5)
Disconnect pilot line hoses (3, 4, 5, 6, 7).
(6)
Sling the swing motor assembly (1) and
remove the swing motor mounting bolts
(8).
·Motor device weight : 61 kgf m (135 lbf ft)
Remove the swing motor assembly.
(7)
When removing the swing motor assem-
bly, check that all the piping have been
disconnected.
2)
INSTALL
(1)
Carry out installation in the reverse order
to removal.
(2)
Bleed the air from the swing motor.
Remove the air vent plug.
Pour in hydraulic oil until it overflows from
the port.
Tighten plug lightly.
Start the engine, run at low idling and
check oil come out from plug.
Tighten plug fully.
(3)
Confirm the hydraulic oil level and check
the hydraulic oil leak or not.
1
5
6
7
8-44
13031GE18
2
21078DA03
3
4
8
21078DA04

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

R520lc-9s

Table of Contents