Quick Installation

We also suggest that you record the serial number of your 24-Port
module. The Hub Planning Charts, located in the CoreBuilder 5000 hub
reference binder, are provided for this purpose.
Table 3-1
outlines the steps necessary to complete the installation of
your module. If you are familiar with installing CoreBuilder 5000
modules, use this table as a checklist. Otherwise, consult the
remainder of this chapter.
Table 3-1

Procedures for Completing Installation

Step
Procedure
1
Verify that your network complies with the
basic rules for network design.
2
Unpack the module.
3
Configure the DIP switch settings. If you
have a network management module
installed in the hub, configure the module
using the management commands
described later in this chapter.
4
Enter the SHOW POWER
command line of the terminal. This
command displays current power
requirements for the hub.
5
Insert the module into an open slot in the
hub and fasten the ejectors and tighten the
faceplate screws. Use proper ESD
precautionary procedures when handling
the module.
6
Establish connections from the 24-Port
module to devices or a 10BASE-T transceiver
using the appropriate connectors and
cabling.
7
Verify LED status for normal operation.
Refer to the CoreBuilder 5000 Integrated System Hub Installation and Operation Guide for
more details on hub power requirements.
For information about potential problems, consult the troubleshooting
techniques in
Chapter
command at the
4.
Quick Installation
3-3
Reference
Designing and Expanding
the Network
(Chapter 2)
Unpacking Procedures
Setting the DIP Switches
or
Configuring the Module
Installing the Module
Installing the Module
Installing the Module
LED and Network
Verification