Case IH Steiger 370 CVT Service Manual page 358

Front axle system
Table of Contents

Advertisement

66. Install two CAS2675 alignment studs into opposite
holes of the housing.
67. Install the original shim pack for the brake carrier and
bearing support over the alignment studs so that all
holes align.
68. Use a hoist to carefully install the brake carrier into the
housing so that the marks put on during disassembly,
align.
NOTE: The brake discs and seals are not installed in the
brake carrier during the bearing preload procedures.
Front axle system - Front bevel gear set and differential
48193194 12/10/2017
25.2 [25.102] / 244
65
RCPH10FWD239ABJ
66
RCPH10FWD210ABJ
67
RCPH10FWD209ABJ

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents