Stacking Instructions; Tools Needed; Installation Preparation - Haier GE UltraFresh GFD55ESSN Technical Service Manual

Table of Contents

Advertisement

If planning to stack the washer and dryer, order
Stacking Kit number GFA28KITN to be used for
this dryer.
Kit sold separately.
Stack dryer only on washer. Do not stack
washer on dryer, washer on washer or dryer
on dryer.
Do not modify this installation kit. Any
modification will void the product Warranty.
WARNING!
Make sure the dryer is unplugged.
Two or more people are recommended to safely
lift the dryer into and out of position.
Avoid damage to the existing utility services.
DO NOT place the washer on top of the dryer.
Location Requirements
When installed in a location other than an alcove
or closet, the minimal clearances to combustible
surfaces and for air opening are: 1-inch on both
sides, and 3-inches' front and rear, and 1-inch
on top. Consideration must be given to provide
adequate clearance for installation and service.
NOTE: If the dryer is approved for installation in
an alcove or a closet, it will be stated on a label
on the back.
When Installed in an Alcove or Closet
• The dryer MUST be vented to the outdoors.
• Minimum clearance between dryer cabinet
and adjacent walls or other surfaces is:
• 0-inches either side*
• 0-inches front
• 0-inches rear
• 0-inches top
• Minimum vertical space from floor to
overhead shelves, cabinets, ceilings, etc., is
67.7-inches.

Stacking Instructions

• Closet doors must be louvered or otherwise
*For improved performance, a 1/2-in. clearance is
suggested on either side.

Tools Needed

• Phillips-head Screw-driver
• Level
• Gloves
• Open End Wrench
• Pliers

Installation Preparation

1. Remove the packaging.
2. Flatten the product carton to use as a pad to
– 17 –
ventilated and have at least 60 square inches
of open area equally distributed. If the closet
contains both a washer and a dryer, doors
must contain a minimum of 120 square inches
of open area equally distributed.
lay the dryer down on its side. Continue using
the carton to protect the finished floor in front
of the installation location.
(Continued next page)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents