Download Print this page
Brooks Instrument Quantim QMBC2 Quick Start Manual

Brooks Instrument Quantim QMBC2 Quick Start Manual

Coriolis mass flow controllers & meters

Advertisement

Quick Links

Quick Start Guide
Quantim
Coriolis Mass Flow Controllers
®
& Meters
(QmC)
Coriolis Mass Flow
This Quick Start Guide applies to QmC NEMA 1 IP40 Meter/Controller

Advertisement

loading

Summary of Contents for Brooks Instrument Quantim QMBC2

  • Page 1 Quick Start Guide Quantim Coriolis Mass Flow Controllers ® & Meters (QmC) Coriolis Mass Flow This Quick Start Guide applies to QmC NEMA 1 IP40 Meter/Controller...
  • Page 2 Step 2: Mounting the Quantim Step 1: Location/Orientation The instrument may be located anywhere in the process line, as long as the following conditions are met: • Before operation, you must be able to stop flow through the meter. During the zeroing procedure, flow must be stopped completely, and the flow meter sensor tube must be full of process fluid to achieve an accurate zero. • During operation, the flow sensor tube must be full of process fluid. • Ambient temperature must remain between 0° and 60°C (32°F and 140°F).
  • Page 3 Step 4: Zeroing Procedure Step 3: Electrical Connections NEMA 1 / IP40 Meter/Controller To assure measurement accuracy, the instrument must be zeroed to the operational installation conditions: • Apply power to instrument for approximately 45 minutes to reach a stable thermal condition prior to applying flow. D-Connector Functions Legends: •...
  • Page 4 Tel (215) 362 3700 Fax (215) 362 3745 BrooksAm@BrooksInstrument.com A list of all Brooks Instrument locations and contact details can be found at www.BrooksInstrument.com Brooks and Quantim are trademarks of Brooks Instrument, LLC. All other trademarks are property of their respective owners.

This manual is also suitable for:

Quantim qmbm2Quantim qmbc3Quantim qmbm3Quantim qmbc4Quantim qmbm4