Chapter 3 Hardware Installation And Initial Configuration; Materials Required - Nortel 1000 Hardware Installation Manual

Application gateway
Table of Contents

Advertisement

Chapter 3
Hardware Installation and Initial Configuration

Materials Required

Materials Required

12
Application Gateway Hardware Installation Guide
Table 5
Readiness checklist (Sheet 2 of 2)
Have you:
Obtained the following:
screwdrivers
an ECOS 1023 POW-R-MATE or similar type of
multimeter
appropriate cable terminating tools
a computer to be connected directly to the Application
Gateway by a DTE—DTE null modem cable, with a
teletype terminal (ANSI-W emulation, serial port,
19 200 bps) for the Application Gateway. Alternatively,
a crossover cable and PC.
Determined the network location for the Application
Gateway? For information, refer to the Application Gateway
Network Integration Guide.
Completed the Application Gateway Pre-Installation
Checklist?
To install the Application Gateway, obtain the following items:
The Application Gateway and its installation CD-ROM.
1.
Save the packaging container and packing materials in case you
Note
must reship the product.
The power cable for the Application Gateway. Check that the power
2.
cord is the exact type required in the host region. Do not modify or use
the supplied AC power cord if it is not the correct type.
The serial cable for the Application Gateway. Alternatively, a
3.
crossover cable.
The CAT5 cables for networking.
4.

Advertisement

Table of Contents
loading

Table of Contents