Deployment Procedure; Preparation - Nortel 7430 Deployment Manual

Nortel 7430: reference guide
Hide thumbs Also See for 7430:
Table of Contents

Advertisement

5.0 Deployment Procedure

Begin the deployment survey by interviewing the customer representative familiar with the full
expectation of coverage and performance of the Digital Mobility solution. During this
conversation, collect the following documents and information:
Site blueprints / maps
Identify any special condition as large metal surfaces, heavy machinery etc may affect
the signals and mark this on the blueprints.
Identify WLAN infrastructure
Agreement with the customer on the entire area to where coverage is required
The number of handsets to be deployed and possible growth
Traffic expectations
Discuss restricted areas where radio coverage is not required
Locate the expected installation point of the Digital Mobility Controller and document any
additional hardware that may be necessary for the site.
It is expected for the technician to properly judge special requirements provided by each unique
site.

5.1 Preparation

Before beginning the physical deployment survey process, execute the following steps:
Charge the batteries for the handsets and Deployment Base Station
If using the Re-chargeable Battery pack to power the Deployment Base Station, connect
the short cable between the power input on the Deployment Base and the Battery pack
(See picture).
Turn on the Deployment Base and verify the power LED is lit.
Turn on the handsets and verify the handsets are subscribed to the Deployment Base.
Establish a test call between handsets and verify sound quality.
Digital Mobility Deployment Guide
23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

7440

Table of Contents