Quick Installation Guide
00825-0100-4379, Rev DA
October 2008
To avoid a potential explosion that could result in death or serious injury, do not
connect both the 6–24 VDC power supply and the RPS at the same time.
Verify Operation of the 753R
1. When the power is applied, the LCD will light and display measurement and status
messages.
2. After the 753R has powered and cycled through the startup sequence, press and hold
the event button for 6-8 seconds, then release. The display will indicate Event Entry, and
measurement and status messages will be shown.
Seal the Unit
1. Replace the FIELD TERMINALS housing cover and tighten so metal touches metal.
2. The temporary orange plugs should be replaced with the included conduit plugs using
approved thread sealant. See Conduit Plug Illustration on page 13.
Verify that the 753R has successfully transmitted to iTraX
1. Log into iTraX (Figure 3 on page 11)
a. https://itrax.datacom.com.
b. Enter your username.
c. Enter your password.
2. Locate the tag on the Summary page as shown in Figure 4 on page 12, and verify
successful transmission at the time of installation. (See Received Time Column).
Configure the 753R
1. Log into iTraX (Figure 3 on page 11
a. https://itrax.datacom.com.
b. Enter your username.
c. Enter your password.
2. Locate and select the 753R tag on the Summary page.
3. Select Device from the menu on the left frame. (See Figure 5 on page 12.)
4. Navigate through the configuration options for any desired changes to the 753R
configuration.
5. Click Submit prior to leaving any page where the configuration has been updated to save
these changes.
Rosemount 753R Indicator
WARNING
®
5