5.2 Installing the gas pressure regulator

Preparing the
materials
Assessing the
situation
HON 380 gas pressure regulator with HON 673/674 controller
Make sure that the following requirements are met before transportation:
 You have seen and taken into account all instructions on the packaging re-
garding the orientation of the packed device, the center of gravity, and at-
tachment points.
 The transport route is clear of obstacles and other barriers, and there is
enough space available for the dimensions of the packed device and the
handling equipment. Make sure to measure all of the package's dimensions!
 The transport route will be able to handle the load exerted by the total weight
of the handling equipment and the load being transported.
 There is enough space for unpacking and installing the device at the instal-
lation location.
Proceed as follows:
Figure
Prepare the following materials:
 Flange gaskets
 Screws
 Washers
 Nuts
The quantity and size are dependent on the following criteria:
 Design and size of the flange
Assess the installation situation.
The numbers have the following meaning:
Figure
Transport and installation
Step
Description
1
Leave the transport panels on the
HON 380 during transport.
2
Lift the HON 380.
Slowly and carefully transport the
HON 380 to the location where it will
be installed.
No.
Meaning
-
Flange gasket (not shown)
1
Nut
2
Washer
3
Screws