Verifying The Installation; Powering On The Device - H3C WAC360 Series Installation Manual

Table of Contents

Advertisement

Figure 11 Connecting the power adapter

Verifying the installation

Before powering on the device, verify that:
The workbench is stable.
There is sufficient clearance around the device.
The power source is as required.
The grounding cable is securely connected.
The console cable and power cord are correctly connected.

Powering on the device

The following uses the WAC360 access controller as an example.
To start the device:
1.
Power on the device. The device initializes its memory and runs BootWare. The following
information appears on the terminal screen:
System is starting...
Press Ctrl+D to access BASIC-BOOTWARE MENU
Press Ctrl+T to start heavy memory test
Booting Normal Extend BootWare
The Extend BootWare is self-decompressing.........................Done!
****************************************************************************
*
*
*
****************************************************************************
Copyright (c) 2004-2017 New H3C Technologies Co., Ltd.
Compiled Date
CPU Type
CPU L1 Cache
H3C WAC360 BootWare, Version 1.02
: April 19 2017
: BCM58622
: 32KB
12
*
*
*

Advertisement

Table of Contents
loading

Table of Contents