We recommend between 3.5 –
4 bar. Do not exceed 4 bar
pressure.
Functions & Controls
General Safety
Flush through approximately 10
litres of sparkling water. Check
and adjust the CO2 pressure
accordingly.
Following installation, it will be
necessary to leave the machine
for up to 1 hour for the initial
chilling cycle to occur.