Mitsubishi Electric ZENSHIN Ecodan QAHV Setup Manual page 55

Table of Contents

Advertisement

After switching to the desired setting, press the [Select] button.
A setting confirmation screen will appear.
Navigating through the screens
■ To save the settings ...... [Select] button
■ To return to the Main display ...... [Menu] button
■ To return to the previous screen ...... [Return] button
The period setting screen will be displayed.
Press the [F1] or [F2] button to move to the item you want to change.
Press the [F3] or [F4] button to change the start date and end date for
the period timer and then press the [Select] button to update the
setting.
The pattern setting screen will be displayed.
* Refer to the section on Weekly timer for details on using the
pattern setting screen.
Weekly timer operation will be disabled in the following situations:
• When Schedule is disabled
When Schedule is disabled with the centralized controller or the
connected unit, Schedule settings cannot be made with the remote
controller.
In the Operation setting screen, press the [F1] button to move the
cursor to "Schedule".
Press the [F3] button to select "Yes".
55

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zenshin ecodan qahv-n560ya-hpb

Table of Contents