Mitsubishi Electric ZENSHIN Ecodan QAHV Setup Manual page 47

Table of Contents

Advertisement

Note: Specify the "Operation ON sensor" with a number equal to or smaller than that of the "Operation
OFF sensor."
Note: Operation will be carried out as shown in the figure below when "Sensor 1" is set for "Operation
ON sensor" and "Sensor 3" is set for "Operation OFF sensor" in [Mode setting] for 3-sensor-type model of
units.
Note: Operation will be carried out as shown in the figure below when "Sensor 1" is set for "Operation
ON sensor" and "Sensor 6" is set for "Operation OFF sensor" in [Mode setting] for 6-sensor-type model of
units.
47

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zenshin ecodan qahv-n560ya-hpb

Table of Contents