Mitsubishi Electric ZENSHIN Ecodan QAHV Setup Manual page 54

Table of Contents

Advertisement

Using period timer
Function description
Following settings can be made to change the specified period and daily operating schedule.
• Set the schedule for ON/OFF, operation mode and set temperature.
* If the periods specified in 1 and 2 overlap, only the period specified in 1 will be implemented.
In the Operation setting screen, press the [F1] button to move the
cursor to
"Schedule".
Press the [F3] button to select "Yes".
Select "Period timer" from the Schedule menu, and press the [Select]
button
The suitable periods for the period timer will be displayed.
To set the period:
Press the [F1] or [F2] button to select the specified date and then
press the [F3] button. ... Move to 3.
To set the operation:
Press the [F1] or [F2] button to select the specified date and then
press the [F4] button. ... Move to 4.
54

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zenshin ecodan qahv-n560ya-hpb

Table of Contents