Mitsubishi Electric ZENSHIN Ecodan QAHV Setup Manual page 14

Table of Contents

Advertisement

Checking the flow rate after the flow rate adjustment operation
Is the secondary side
disabled?
Yes
Has the steps been
completed in table A?
Yes
Please set the following
dipswitches
Pump output opening/water flow rate
adjust valve opening
Flow rate (pump output opening 16%)
Flow rate (pump output opening 27%)
Flow rate (pump output opening 100%)
Pump output opening/water flow rate
adjust valve opening
Flow rate (pump output opening 16%)
Flow rate (pump output opening 27%)
Flow rate (pump output opening 100%)
Is the flow rate at 2L/min or
above through output 1000
to 100?
Yes
Complete
No
Continue to page
20
No
Complete Steps
SW2
10
5
OFF
OFF
Press SWP3 repeatedly until "dxx" is displayed
"dxx" function stores the flow rate for the pump output opening
Close <-------------- Water flow rate adjust valve opening --------------> Open
1600
1400
1200
d01
d02
d03
d10
d11
d12
d19
d20
d21
Please record results
Close <-------------- Water flow rate adjust valve opening --------------> Open
1600
1400
1200
Air may still be present, Perform an air bleeding operation and
No
water flow rate adjustment operation again
14
SW3
6
7
8
OFF
OFF
OFF
and valve opening
Press SWP1 or SWP2 to
display the operation
result of the flow rate
code
1000
800
600
400
d04
d05
d06
d07
d13
d14
d15
d16
d22
d23
d24
d25
1000
800
600
400
9
10
ON
ON
200
100
d08
d09
d17
d18
d26
d27
200
100

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zenshin ecodan qahv-n560ya-hpb

Table of Contents