Trane S9V2B040U3PSBB Installer's Manual page 84

Upflow/horizontal and dedicated downflow gas-fired, direct/non-direct vent, 2–stage condensing variable speed furnaces
Table of Contents

Advertisement

F F u u r r n n a a c c e e C C o o m m b b u u s s t t i i o o n n A A i i r r E E x x h h a a u u s s t t O O p p t t i i o o n n s s
1.
Attach the vent outlet gasket to the vent outlet.
2.
Install vent outlet to top of cabinet using 2 screws supplied in the
doc pack.
3.
Install vent inlet gasket and vent inlet using 4 screws supplied in
the doc pack.
1.
Remove three inducer screws.
2.
Rotate the inducer so that the outlet is pointing vertically.
3.
Use the three inducer screws to reattach the inducer to the cold
header. Torque to 30 in.-lbs. Do not overtighten.
84
18-CE01D1-1M-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents