Trane S9V2B040U3PSBB Installer's Manual page 72

Upflow/horizontal and dedicated downflow gas-fired, direct/non-direct vent, 2–stage condensing variable speed furnaces
Table of Contents

Advertisement

F F u u r r n n a a c c e e C C o o m m b b u u s s t t i i o o n n A A i i r r E E x x h h a a u u s s t t O O p p t t i i o o n n s s
1.
Remove two 3" plugs on left side of cabinet. To be used for
combustion air and vent exhaust.
2.
Install the two 3" plugs into the two 3" default openings on the top
of the cabinet.
1.
Loosen the clamp holding the 45° elbow. Remove the elbow and
discard.
1.
Remove the three inducer mounting screws.
2.
Rotate inducer counter-clockwise so that the inducer outlet aligns
with the exhaust vent outlet.
3.
Insert and re-tighten screws to 30 in.-lbs. Do not overtighten.
72
18-CE01D1-1M-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents