Trane S9V2B040U3PSBB Installer's Manual page 76

Upflow/horizontal and dedicated downflow gas-fired, direct/non-direct vent, 2–stage condensing variable speed furnaces
Table of Contents

Advertisement

F F u u r r n n a a c c e e C C o o m m b b u u s s t t i i o o n n A A i i r r E E x x h h a a u u s s t t O O p p t t i i o o n n s s
1.
Remove three inducer screws.
2.
Rotate the inducer so that the outlet is pointing vertically.
3.
Use the three screws to reattach the inducer to the cold header to
30 in.-lbs. Do not overtighten.
76
18-CE01D1-1M-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents