Trane S9V2B040U3PSBB Installer's Manual page 73

Upflow/horizontal and dedicated downflow gas-fired, direct/non-direct vent, 2–stage condensing variable speed furnaces
Table of Contents

Advertisement

1.
Remove the pressure switch bracket assembly.
2.
Remove the screw that holds PS2, rotate 90 degrees clockwise,
and reattach.
3.
Reattach the pressure switch bracket assembly.
Note: Illustration shows the PS2 pressure switch in the final rotated
position.
1.
Attach the vent outlet gasket to the vent outlet.
2.
Install vent outlet to top of cabinet using 2 screws supplied in the
dock pack.
3.
Install vent inlet gasket and vent inlet using 4 screws supplied in
the dock pack.
4.
Install the grommet for the condensate drain tube. The drain may
be located on either side of the cabinet.
18-CE01D1-1M-EN
F F u u r r n n a a c c e e C C o o m m b b u u s s t t i i o o n n A A i i r r E E x x h h a a u u s s t t O O p p t t i i o o n n s s
73

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents