Trane S9V2B040U3PSBB Installer's Manual page 55

Upflow/horizontal and dedicated downflow gas-fired, direct/non-direct vent, 2–stage condensing variable speed furnaces
Table of Contents

Advertisement

Table 4. Return Duct Connections (continued)
Downflow Furnace with Top Return and Plenum with Filter Box
1.
Remove the top plate.
2.
Attach the filter box to the top of the furnace.
3.
Attach ducting.
4.
Seal per local codes and requirements.
18-CE01D1-1M-EN
F F u u r r n n a a c c e e G G e e n n e e r r a a l l I I n n s s t t a a l l l l a a t t i i o o n n
55

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents