Daikin FXHQ63AVEB8 Installer And User Manual page 58

Vrv system air conditioner
Hide thumbs Also See for FXHQ63AVEB8:
Table of Contents

Advertisement

17
|
Piping installation
Installer and user reference guide
58
a b c
a Clamp of the pipe port cover
b Cables (except cable of expansion valve)
Upward piping
INFORMATION
L-shaped connection piping kit (optional accessory) is required.
1 Remove the top pipe port cover and cut out the holes for piping. When
cutting out the holes, make sure to avoid the knob part of the cover. Use an L-
shaped connection piping kit (optional accessory) for the piping. Run the pipes
through the cut out holes.
a Upward refrigerant piping
b Top pipe port cover
Right piping
1 Remove the reinforcing plate at the right side and put back the screw in the
original position on the indoor unit.
2 Remove the decoration side panel.
3 Remove the rectangular part of the decoration side panel.
a b
c
d
e
a Round part
b Rectangular part of the decoration side panel
c Decoration side panel
d Screw
e Reinforcing plate
f Right refrigerant piping
4 After the drain and refrigerant piping is finished, install the reinforcing plate
(optional step) and the decoration side panel back.
b
a
f
FXHQ-A
VRV system air conditioner
4P715928-1 – 2022.11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fxhq32aveb8Fxhq100aveb8

Table of Contents