Pressure Check; Preliminary Check - Ecom DP Operation Manual

Hide thumbs Also See for DP:
Table of Contents

Advertisement

4. Adjust the correct figure using <UP/DOWN>.
5. Press <OK> to confirm the corrected value.

4.2. Pressure check

Proceed as follows:
1. Close the conduit with a suitable adapter (part of
ecom-DPK).
2. Connect the components a described in ecom-DPK
manual.
3. Scroll with <UP/DOWN> until the menu „Pressure
check". Activate with <OK>-Taste.
4. With the compressed-air pump create the pre-adjusted
test pressure (the unit beeps as soon as the pressure
level is achieved).
5. Interrupt the connection to the air pump (switch-off the
ball valve).
6. Wait for stabilisation time (if the pressure remains in
the range „test pressure +/- 10% during stabilisation time,
so the measurement time will start).
7. Once the measurement time is over, the result is dis-
played and can be sent to the IR printer (option) thus
pressing <F2> (Print).
8. If the menu „Pressure Check" is selected again, so the
result can be called up with <F1> (as long as the ecom-
DP is on) or a new measurement can be started with
<OK>.
9

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DP and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents