Advertisement

Quick Links

HP-6S
HP-6M
HP-6M (Main Unit)
INSTALLATION MANUAL
HP-6S (Sub Unit)
Australia & New Zealand

Advertisement

Table of Contents
loading

Summary of Contents for Energizer HOMEPOWER HP-6S

  • Page 1 HP-6S HP-6M HP-6M (Main Unit) INSTALLATION MANUAL HP-6S (Sub Unit) Australia & New Zealand...
  • Page 2: Table Of Contents

    8 Star Energy Pty Ltd. 2. Energizer Homepower HP-6 Series(HP-6M/HP-6S) All other brand names are trademarks of their respective owners. Neither 8 Star Energy Pty Ltd nor Energizer Brands, LLC is affiliated with the respective owners of their trademarks.
  • Page 3: Important Safety Instructions

    This Installation Manual contains important safety instructions that are key to the proper installation of the 1. Important Safety Instructions Energizer Homepower (HP-6M/HP-6S) but are not meant to be a complete explanation of designing an energy storage system. All installations must comply with local and national electrical standards. Read the entire This Installation Manual contains essential instructions that must be followed during installation and maintenance document before installing or using the Energizer Homepower (HP-6M/HP-6S).
  • Page 4: Warnings

    (BESS), designed to operate seamlessly with existing solar (PV) installations. It is easy to install and allows position. Do not impact, pull, drag, step or apply strong force on the Energizer Homepower HP-6 a high degree of customisation to suit a variety of energy considerations. The Energizer Homepower HP-6 Series is Series units.
  • Page 5 Energizer Homepower HP- Series - Installation Manual Energizer Homepower HP- Series - Installation Manual c. When site loads are lower than solar generation and battery is full (SoC 100%), the excess solar generation 3.3. Percentages - Within the Scheduler, you will need to input a percentage for the instruction you want the is exported to the utility grid.
  • Page 6: Specifications

    Specifications 3.4. Grid Charge - Specifies when to use the grid to charge the battery. If left unticked, Energizer Homepower will not charge from the grid. a. E.g. 20% @ 5am - 7am - Following this instruction, the battery will charge from the grid at 720W Noark Battery Isolator (DC) between the times of 5am and 7am.
  • Page 7: Single Line Diagram

    HP-6S unit is considered a sub-system of the Main Unit (HP-6M) and is never installed in a stand-alone manner. The Energizer Homepower HP-6 Series is designed to operate as an AC coupled BESS in conjunction with an Performance de-rating expected in extreme ambient temperature.
  • Page 8: Site Requirements

    (mobile data). • Ensure that the Energizer Homepower HP-6 Series units are not installed on a wall that may have flammable or Cable Gauge and Length Information corrosive equipment (including natural gas supply valves, gas meters or external air conditioning units).
  • Page 9: Installation

    Step 2 – Transporting & Unpacking Energizer Homepower HP-6 Series Unit(s) Keep the Energizer HP-6M unit(s) in their original package(s) until they are ready to be installed. Ensure that the The installer shall identify a suitable location for the Energizer Homepower HP-6 Series system, maintain box is stored flat on its back during transport.
  • Page 10 SUB to MAIN Alignment Tool the appropriate fastener based on the wall material and local building codes. The Energizer Homepower HP-6 Series units can be mounted on a variety of surfaces including wood, metal or concrete walls. Please follow the recommendations for each surface below: •...
  • Page 11: Step 4 - Mounting The Main Unit(Hp-6M)

    © 2021 Energizer. Energizer and certain graphic designs are trademarks of Energizer Brands, LLC and related subsidiaries and are used under license by 8 Star Energy Pty Ltd. All other brand names are trademarks of their respective owners. Neither 8 Star Energy Pty Ltd nor Energizer Brands, LLC is a liated with the respective owners of their trademarks.
  • Page 12: Step 5 - Accessing The Main Unit "Connection Zone

    Then ensuring the teeth are aligned with the slots, both horizontally qualified Energizer Homepower Technician. and vertically, push the unit onto the bracket and gradually lower it into place until it fully engages. Sticker may be peeled off after mounting.
  • Page 13: Step 6 - Electrical Connections(Ac Side)

    Step 6 – Electrical Connections (AC side) Connecting the Backup AC (if applicable) Electrical connections, including AC Isolator requirements for the Energizer Homepower HP-6 In the absence of grid power or grid-failure, the Main Unit (HP-6M) has the ability to supply power to essential Series system must be carried out as per the recommended local &...
  • Page 14: Step 7 - Connecting The Current Transformers(Cts)

    DRM Functions The HP-6M is supplied with two Current Transformers, one to measure Solar PV generation and one to measure For installations in Australia & NZ, The Energizer Homepower (HP-6M/HP-6S) supports a full suite of Demand Utility Grid Consumption. Response Management functions (DRMs 0 – 8) that control the inverter power output to comply with utility regulations.
  • Page 15: Step 9 - Multiple Battery Installations

    2.4G Wi-Fi Block all unused threaded openings on either side using the aluminium hole blockers provided to ensure a The Energizer Homepower HP-6M also supports 2.4 GHz Wi-Fi connectivity. If this method is being used, the Wi-Fi water-tight seal. configuration shall be carried out using the Energizer Homepower Installer App.
  • Page 16: Step 10 - Mounting The Sub Unit(S)(Hp-6S)

    Once you have removed the IAP, you will gain access to all parts required for the installation. Please refer to the guide below to get familiar with the various parts. Please note that port F is strictly for use by a qualified Energizer Firstly, ensure that the Sub Unit (HP-6S) battery isolator under the Magna-Flap is turned to the OFF position (refer Homepower Technician.
  • Page 17 Energizer Homepower HP- Series - Installation Manual Energizer Homepower HP- Series - Installation Manual 2. Remove the head and rubber seal (2-hole with side splits) off the M20 cable glands. 3. Feed parallel comms and earth cables through cable glands from one connection zone to the other.
  • Page 18: Installation Cross-Check

    (residual current circuit breakers with overcurrent protection) for protection against electrocution or fire risk by an earth fault, it is recommended to use a Type B RCD/RCBO upstream of the Energizer Homepower HP-6 system. For example, in Australia it is recommended to use a 30mA / 32A, TYPE B RCD to be connected to the backup circuit, and follow the local electrical requirements for AC supply, e.g.
  • Page 19: Commissioning

    Series - Installation Manual 7. Commissioning The Energizer Homepower Installer App requires a mobile device with access to Internet and Bluetooth. The HP-6M must be used to commission the Energizer Homepower (HP-6M/HP-6S) as shown within the Energizer Homepower Commissioning Video. energizerhomepower.com/app/installation.
  • Page 20: Using The System

    The Energizer Homepower HP-6 Series does not require any routine maintenance. For accumulation of dirt, dust, or debris, please ensure the product frame is cleaned using a soft dry cloth. The Energizer HP-6M has vents The Edge Lighting mimics a...
  • Page 21 Series - Installation Manual In case of water leakage and/or flooding: • Inspect from a safe distance to ensure that the Energizer Homepower HP-6 Series system and/or associated electrical equipment are not submerged. Ensure to stay out of water surrounding the system.
  • Page 22 energizerhomepower.com...

This manual is also suitable for:

Homepower hp-6m

Table of Contents