Compressed Air Connection; Syrup Requirements; Electrical Requirements; Syrup Connections - Cornelius VIPER FMFV Installation And Operation Manual

Frozen multi flavour valve
Table of Contents

Advertisement

C
A
OMPRESSED
IR
Use a source-dedicated secondary pressure regulator, fittings and clamps to connect the Compressed air line to
the Kit. Set the regulator for 45 ±5 psig at the Kit. Run the tubing for the compressed air from the secondary regu-
lator to the Kit and make all appropriate connections. Ideally, locate the regulator within 3 ft. of the unit. It is to be
set to 45 psig, not lower.
S
R
YRUP
EQUIREMENTS

Syrup Connections

Use the appropriate fittings and clamps to connect the syrup lines to the unit. Run the tubing for the syrup from the back room to
the unit and make all appropriate connections.
NOTE: Syrup connections require 1/4" I.D. tubing. All hoses must reach the back of the unit plus an
adequate amount of extra tubing to allow the unit to be pulled out for servicing.
E
R
LECTRICAL
EQUIREMENTS
Refer to the nameplate to determine the power requirements before connecting electrical power to the unit. All of
the power cords shall comply with safety requirements outlined in the EC Standards (EN60335-1 1 Clause 24.1) in
countries where CE compliance is required. All cords must be HD 21 or HD 22.

Line Voltage

The recommended line voltage for FMFV kit is 230VAC 50/60. Measure the voltage at the wall outlet to verify
proper wiring of the outlet before plugging the FMFV kit.

Power

The power circuit must have 1 amp overload protection, such as a circuit breaker or fuse that meets local and national
electrical codes.
NOTE: Viper & FMFV kit uses different power wall outlets.
© 2018-19, Cornelius Inc.
C
ONNECTION
- 4 -
FMFV - Installation Manual
Publication Number: 919000012INS

Advertisement

Table of Contents
loading

Table of Contents