Installation Of Valve - Cornelius VIPER FMFV Installation And Operation Manual

Frozen multi flavour valve
Table of Contents

Advertisement

FMFV - Installation Manual

Installation of Valve

1.
Defrost cylinders by referring the Viper unit manual.
When the barrel is defrosted, go to the Maintenance menu. If the security feature is active, access
2.
the Maintenance menu by pressing and holding the far left and right buttons simultaneously for
approximately five seconds.
3.
Remove the splash panel. See "BRIX Setup Menu
4.
Turn the Product/BRIX valve off to shutoff product to the barrel.
5.
Place a large waste container under the dispense valve.
Barrel Maintenance menu, press the PURGE button to re-pressurize the barrel with CO
6.
product level lowers in the barrel, partially close the valve to avoid spurting.Em[ty product from the
barrel.
7.
Disconnect the BIB from the unit, shut unit down, disconnect electrical power from Unit.
Remove the hex nuts and flat washers
8.
securely, then remove the faceplate
from the barrel.
Carefully remove the existing Valve from the faceplate.
9.
Refer the procedure mentioned in viper service manual for removing Motorman and SPH/Delta
valves.
Assemble the Valve (910002035) to face
plate using retainer ring provided with
valve assembly
10.
NOTE: Use snap ring plier to
Publication Number: 919000012INS
Table 5: Installation of Valve
remove retainer ring.
- 13 -
Figure 17.
Retaining ring
Figure 18.
As
.
2
© 2018-19, Cornelius Inc.

Advertisement

Table of Contents
loading

Table of Contents