Installation; Delivery, Inspection & Unpacking; Counter Location; Compressed Air Requirements - Cornelius VIPER FMFV Installation And Operation Manual

Frozen multi flavour valve
Table of Contents

Advertisement

FMFV - Installation Manual
D
, I
ELIVERY
NSPECTION
NOTE: Cornelius is not responsible for damaged freight. If damage is found, you must save all
packaging material and contact the freight carrier. Failure to contact the carrier within 48 hours
of receipt may void your claim.
1. Inspect the carton and note any damage, regardless if it appears minor. If the carton is damaged, note on the
consignee copy of the freight invoice "exterior carton damage – concealed damage possible" and contact the freight
company immediately.
2. Remove the exterior carton sleeve, internal fillers and plastic bag around the unit. Carefully inspect the unit for
damage.
3. Open the packages of loose parts and inspect all of the parts for damage or missing parts. Check the parts
received against the packing list to ensure receipt of all parts.

COUNTER LOCATION

Select a location in a well ventilated area, close to a grounded electrical outlet and back room connections.Do not
place unit close to hot and /or steaming machines.
The Minimum clearance is 76.2 mm (3 in.) on side after placing the kit on the viper, Refer below image.
C
A
OMPRESSED
IR
NOTE: Primary compressed air source of 50-80 psig is required.
NOTE: Compressed air connections require 1/4" I.D. tubing. All hoses must reach the back of the unit
plus an adequate amount of extra tubing to allow the unit to be pulled out for servicing.
NOTE: Use a dedicated secondary pressure regulator adjusted to 45 ±5 psig to supply the unit.
NOTE: Air should be dry, filtered and free from oils and particulates.
Publication Number: 919000012INS

INSTALLATION

& U
NPACKING
R
EQUIREMENTS
C
L
E
A
R
A
N
C
E
3.55"
3.0"
Figure 1.
- 3 -
© 2018-19, Cornelius Inc.