2.3.1
Adjusting the Leveling Pads
If the system will not be bracketed to the floor of the operating location you must
lower the leveling pads to prevent movement.
1. Remove the leveling wrench from inside the system.
2. Use the leveling wrench to lower the leveling pads at the four corners of the
system so the system cannot move.
3. Secure the leveling wrench inside the system with the plastic strap.
2.3.2
Securing the Cabinet to the Floor
1. Place the NEBS Zone 4 earthquake bracket between the outer kick-panel bracket
and the inner kick-panel bracket and secure the assembly to the cabinet using the
existing bolts.
Note – It may be necessary to adjust the cabinet leveling pads to align the NEBS
Zone 4 earthquake bracket.
2. Repeat
Caution – Before you begin drilling examine site blueprints to ensure that no pipes
or wires run beneath operating location.
2-6
Sun Fire 6800/4810/4800/3800 Systems Installation Guide • April 2004
Step 1
for the remaining kick-panel brackets.