Operation
5
Operation
5.1
Device operation
●
Connect the device (KIG 2) with the lifting equipment. The lifting equipment must be adjusted with carrying capacity of
the device (KIG 2)!
●
Move the device (KIG 2) slowly down into the gripping good (cone), until the rectangular tube lays on the gripping
good (cone). Take care of stirrups!
●
Lifting the device (KIG 2), the automatic release unlocks and the gripping good (cone) can be lifted.
●
Now transport the gripping good (cone) carefully to the destination place.
●
Setting down the device (KIG 2) the automatic release locks and the device (KIG 2) can be lifted without the gripping
good (cone).