Wall Mounting the Unit
Step 1: Mark the wall bracket position
using the dimensions shown. Note the
position of the top of the unit in
relation to the wall bracket. Ensure
the bracket position is horizontal.
Step 2: Attach the wall bracket to the
wall using appropriate fixings.
Step 3: Lift the unit and locate the two
hooks on the rear onto the wall
bracket.
Step 4: Make sure the unit is level or
leaning slightly backwards; this is to
ensure the condensate drain
functions correctly.
The mounting feet at the base of the
unit are adjustable. From the factory,
the mounting feet are set to
compensate for the standoff caused
by the mounting bracket. Adjust the
feet in or out to level the unit as
necessary.
If mounting on uneven walls, the
spacers (A) may need to be removed
before the feet can be screwed further
into the unit.
Lock the mounting feet into their final
position using the M6 nuts (B).
MVHR Installation and User Guide 476930
6
Installation
Top of unit
A
B