Maintenance; Screw Connections; Cleaning; Modification Of The Safety Valve - Richter KSE/F Series Installation And Operating Manual

Safety valves with cerification spring-loaded
Hide thumbs Also See for KSE/F Series:
Table of Contents

Advertisement

Series KSE/F, KSE-C/F
9

Maintenance

Safety
valves
operability at regular intervals according to
the national regulations (in Germany: UVV -
pressure vessels, VBG 17 § 32 and TRD
601 sheet 2, paragraph 3.4).
♦ The intervals for regular checks are to be laid
down by the customer in line with the operating
conditions.
♦ The lifting lever 238 allows the valves to be
actuated from outside, they then open at the
operating pressure available. For lifting, the pres-
sure is to be at least 85% of the test pressure.
♦ All repair work is to be performed by qualified
personnel using the appropriate tools.
♦ For the arrangement, designation and item
numbers of all parts of the valve, see Section 10.
♦ Spare parts are to be ordered with all the details in
acc. with the valve identification.
♦ Only original spare parts may be installed.
Fig.
9530-001-en
Revision 19
TM 9549
Edition 11/2018
must
be
checked
for
Fig. 17
9.1

Screw connections

♦ To prevent leaks, a regular check of the connec-
tion screws should be made in line with the operat-
ing requirements.
For tightening torques, see Section 1.3.
♦ To prevent screw connections from becoming
loose in the event of pressure fluctuations or plant
vibrations, we recommend the installation of ex-
pansion joints or pulsation dampers.
9.2

Cleaning

Prior to starting any repair work, the valve is
to be thoroughly cleaned. Even if the valve
has been properly emptied and rinsed,
residual medium may still be found in the
valve, e.g. between the lining and body or in
the bonnet.
Plastic parts may absorb medium which gradually
emerges from the material after cleaning.
Wear the prescribed protective clothing!
Safety valves which have been cleaned with water or
other media must be dried before re-assembly of the
parts and installation of the valve in the plant.
9.3
Modification of the safety
valve
If modifications to the valve are required, the
manufacturer must always be consulted.
Examples: Modification with changed test pressure,
replacement of the spring or adaption to the mass flow
by reducing the travel.
After
approval
modifications can be performed either by the
manufacturer or by the customer under the guidance
of a technical supervisory agency or any other
approval authority.
9.4
Adjustment of the test pres-
sure
♦ Undo locking plate 539, dismantle lifting lever 238
and unscrew the lifting cap 535.
♦ Undo nut 920/3.
♦ Adjust the spring tension with the adjusting screw
538 to the specified test pressure.
♦ Counter adjusting screw 538 with a hex. thin nut
920/3 resp. with centering nut 555 (DN 25/50).
♦ Check test pressure.
16
Page
by
the
manufacturer,
17
these

Advertisement

Table of Contents
loading

Table of Contents