Commissioning; Installation - Festo 152962 Operating Instructions Manual

Hydraulic power packs with 5 l tank
Table of Contents

Advertisement

Available languages

Available languages

Hydraulic power packs with 5 l tank
9

Commissioning

9.1

Installation

There are mounting holes on three sides of the flange (11), which allows the hydraulic power pack to be
installed in different positions. The hydraulic power pack is secured with 2 profile connectors. These are
built into the flange on the back at the factory.
If the hydraulic power pack will be installed to a different flange surface, the profile connectors must be
remounted to the corresponding surface. Refer to the respective mounting instructions with regard to
possible laboratory furniture mounting positions.
The hydraulic power pack can be installed in 3 different positions.
Mounting position
20
Description
Vertical, electric motor at top
Horizontal, pressure gauge at top
Horizontal, pressure gauge at side with connection T at bottom
Attention
The fill-level cannot be viewed in the sight glass in this mounting position.
© Festo Didactic 369805

Advertisement

Table of Contents
loading

This manual is also suitable for:

8065049

Table of Contents