Assembly Preparation - Dansons Group Pit Boss 2 Series Assembly And Operation Manual

Gas vertical smoker
Table of Contents

Advertisement

Available languages

Available languages

Parts are located throughout the shipping carton, including underneath the grill. Inspect the grill, parts, and hardware blister
pack after removing from the protective shipping carton. Review and inspect all parts by referencing the parts list. If any part
is missing or damaged, do not attempt to assemble. Shipping damage is not covered under warranty. Contact your dealer or Pit
Boss® Grills Customer Care for parts.
service@pitboss-grills.com | USA: (480) 923-9630 | Canada (Toll Free): 1-877-942-2246
IMPORTANT: To ease installation, using two people is helpful (but not necessary) when assembling this unit.
Tools required for assembly: Phillips-head screwdriver and wrench. Tools not included.
-
It is advised to review each step entirely before starting assembly on instructions.
Hardware combination involving a locking washer and washer should be installed with the locking washer closest to the
-
head of the screw.
-
Tighten screws completely after all screws for that step have been installed.
This is a stationary position for a gas smoker assembly with gas cylinder. If you want to move the unit, the gas cylinder
1
mounting bracket and regulator QCC1 connector must be disconnected prior to moving.
1
Outward facing screws.
2
Install screws on the inside edge of the leg.
3
Loosen the two pre-assembled screws, 2-3 turns. Tighten once the assembly screws are installed.
4
Repeat the Support Panel installation for the opposite legs.
5
Ignition wire.
6
Make sure that the tip of the valves are completely inside the end opening of the Burner Tubes.
7
Turn unit upright.
8
Remove the Door Assembly and set aside.
9
Align the Upper Cabinet to the Lower Cabinet then tighten all screws.
10
The Heat Indicator is supplied with one fiber washer and one wing nut.
11
When removing the Wood Chip Box lift up on the handle and pull out the Wood Chip Box.
12
Unit is assembled, continue to the Connecting Gas Supply section.

ASSEMBLY PREPARATION

GO TO PAGE 67 FOR STEP-BY-STEP ASSEMBLY DIRECTIONS.
IMPORTANT
NOTE
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pit boss pbv2g110791

Table of Contents