Dodge R1500 1999 Service Manual page 158

Table of Contents

Advertisement

Avenger 2.5L & Sebring Coupe 2.5L
Connect approved recovery/recycling equipment to vehicle.
Evacuate A/C system using recovery/recycling equipment according to
manufacturer's instructions.
Dakota, Durango, Ram Pickup & Ram Van/Wagon
1) Connect approved recovery/recycling equipment and manifold
gauge set. Fully open manifold gauge set low-side and high-side
valves, and start vacuum pump. Operate vacuum pump until low-side
vacuum reading of 26 in. Hg or more. Close all valves and turn vacuum
pump off. Observe vacuum gauge and go to next step.
2) If A/C system maintains specified vacuum for 5 minutes,
restart vacuum pump, open low-side and high-side valves, and evacuate
system for an additional 10 minutes. Close all valves. Turn vacuum
pump off and disconnect pump.
3) If A/C system cannot get to or maintain specified vacuum,
check for a defective vacuum pump or a leak in A/C system or gauge
set. See LEAK TESTING. Repair or replace components as necessary.
All Other Models
1) Connect approved recovery/recycling equipment and manifold
gauge set to vacuum pump. Fully open manifold gauge set suction and
discharge valves, and start vacuum pump. Operate vacuum pump at least
45 minutes with a low-side vacuum reading of 26 in. Hg or more (28 in.
Hg or more on Neon). Close all valves. Turn vacuum pump off and
observe vacuum gauge.
2) If A/C system maintains specified vacuum for 30 minutes,
open all valves, start vacuum pump and operate for an additional 10
minutes. Close all valves. Turn vacuum pump off and disconnect pump.
If A/C system cannot get to or maintain specified vacuum for 30
minutes, check for a defective vacuum pump or leak in A/C system or
gauge set. See LEAK TESTING. Repair or replace A/C system components
as necessary.
FORD MOTOR CO.
1) If using approved Recovery/Recycling/Charging Center (023-
00150) connect to high-side and low-side service valves. See SERVICE
VALVE LOCATIONS under SYSTEM SERVICE VALVES. Connect manifold gauge
set center hose to vacuum pump.
2) Open both valves on manifold gauge set. Operate vacuum
pump until low-side vacuum reading is at least 29.5 in. Hg (as close
to 30 in. Hg as possible). Operate vacuum pump for at least 45
minutes.
3) Close both valves on manifold gauge set. Turn off vacuum
pump. Observe low-side gauge. Any loss of vacuum in 5 minutes
indicates a system leak. Perform leak testing procedure. See LEAK
TESTING. Repair system as necessary and repeat evacuation procedure.
GENERAL MOTORS
Manufacturer recommends using A/C Refrigerant Recovery,
Recycling And Recharging (ACR4) System (J-39500). The ACR4 system has
one filtering cycle during recovery plus an automatic multiple pass
filtering during evacuation cycle. Follow manufacturer's instructions
provided with ACR4 equipment being used.
JEEP
1) Connect approved recovery/recycling equipment and manifold
gauge set. Fully open manifold gauge set low-side and high-side
valves, and start vacuum pump. Operate vacuum pump until low-side

Advertisement

Table of Contents
loading

Table of Contents