Post installation checks

The following checks should be made to ensure that the tail lift has been correctly and
safely installed. These checks should be carried out by the installer after the tail lift and
vehicle have been prepared by him for regular operation.
Checks (2, 3, 4, 5, 9, 11 och 15 if available).
Lift, tilt and lowering with fixed
1.
control unit.
Lift, tilt and lowering with other
2.
control unit(s). Option.
Function and possible worn bearings
3.
on roll-stop. Option.
Function of locking mechanism.
4.
Option
Sealing strips and horizontal guide.
5.
Option.
Product approval