Electrolux Professional IB5 700 Installation Manual

Electrolux Professional IB5 700 Installation Manual

Flatwork ironers with integrated thermal oil boiler

Advertisement

Quick Links

PART 1:
INSTALLATION
Installation
manual
Flatwork
ironers IB5 700
With Integrated Thermal Oil Boiler
011040xx/GB
20.2017
Manual Version V1.00.6
Adjustments still possible
1
The English manual is the original manual.

Advertisement

loading
Need help?

Need help?

Do you have a question about the IB5 700 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Electrolux Professional IB5 700

  • Page 1: Part 1: Installation

    PART 1: INSTALLATION Installation manual Flatwork ironers IB5 700 With Integrated Thermal Oil Boiler 011040xx/GB 20.2017 Manual Version V1.00.6 Adjustments still possible The English manual is the original manual.
  • Page 2 CUSTOMER: MACHINE NR.: VOLTAGE: 3 x 400V + N + PE MACHINE TYPE: IB5 730 F - G WIRING DIAGRAM NR.: 01-7030K220G1P Electrolux Professional AB 341 80 Ljungby, Sweden www.electroluxprofessional.com Manual Version V1.00.6 Adjustments still possible...
  • Page 3 FOREWORD This manual contains information on installation, operation and maintenance. The operator should read this manual carefully and become familiar with the machine regulations before the machine is commissioned. In this document we have attempted to answer any questions you may have. For further information or explanation, please contact our after-sales department.
  • Page 4 WE CAN’T GIVE ANY WARRANTY TO THE CONSUMABLE PARTS : - The padding - The feed belts. - Chains - Pump seals. - Oil change. - Transport damage. - Components damaged by poor maintenance. - Spare parts who are placed by a technician who is not trained or schooled by Electrolux.
  • Page 5: Table Of Contents

    PART 1: INSTALLATION ............... 1 1.1 H ......................6 ANDLING OF THE MACHINE 1.2 L ......................9 AYOUT AND CONNECTIONS 1.3 T .................... 13 ECHNICAL DATA AND DIMENSIONS 1.4. I ........................17 NSTALLATION 1.5 G ..........................32 ENERAL Manual Version V1.00.6 Adjustments still possible...
  • Page 6: Handling Of The Machine

    1.1 Handling of the machine. Remove any obstacles under machine placement area. Fasten the lifting cables to the supplied lifting eye bolts on the top. Manual Version V1.00.6 Adjustments still possible...
  • Page 7 Lift the machine. Make sure the cables are positioned correctly so that machine hangs horizontally. Make sure nobody walks under the load. Lift and relocate machine carefully, without sudden shocks or movements. Place the machine on the ground, as close to the permanent location as possible. If the machine needs further moving, use rollers.
  • Page 8 To place the rollers under the machine, the machine can be lifted with a hydraulic jack on these 4 supports. Once machine is in final position, remove the wooden bars. They are screwed underneath the ironer foot plates. Remove all packing materials. Level machine.
  • Page 9: Layout And Connections

    1.2 Layout and connections Manual Version V1.00.6 Adjustments still possible...
  • Page 10 Manual Version V1.00.6 Adjustments still possible...
  • Page 11 Manual Version V1.00.6 Adjustments still possible...
  • Page 12 Manual Version V1.00.6 Adjustments still possible...
  • Page 13: Technical Data And Dimensions

    1.3 Technical data and dimensions. IB5 725 G IB5 730 G IB5 733 G Roll Diameter 700 mm 700 mm 700 mm Length 2500 mm 3000 mm 3300 mm Dimensions Length 3750 mm 4250 mm 4550 mm Depth 2036mm 2036mm 2036mm Height 1453mm...
  • Page 14 IB5 725 E IB5 730 E IB5 733 E Roll Diameter 700 mm 700 mm 700 mm Length 2500 mm 3000 mm 3300 mm Dimensions Length 3750 mm 4250 mm 4550 mm Depth 2036mm 2036mm 2036mm Height 1453mm 1453mm 1453mm Speed Minimum –...
  • Page 15 IB5 725 F - G IB5 730 F - G IB5 733 F - G Roll Diameter 700 mm 700 mm 700 mm Length 2500 mm 3000 mm 3300 mm Dimensions Length 3750 mm 4250 mm 4550 mm Depth 2140mm 2140mm 2140mm Height...
  • Page 16 IB5 725 F - E IB5 730 F - E IB5 733 F - E Roll Diameter 700 mm 700 mm 700 mm Length 2500 mm 3000 mm 3300 mm Dimensions Length 3750 mm 4250 mm 4550 mm Depth 2140mm 2140mm 2140mm Height...
  • Page 17: Installation

    1.4. Installation. 1. Unload the machine as described. See: 1. Handling of the machine The ironing machine is best moved with rollers. The ironing machine must be positioned perfectly level. For the purposes of service and maintenance work, a space of at least 50 cm must be left to the right side and left side and 80 cm behind the machine.
  • Page 18 2. Remove all packaging materials such as plastic and cardboard from the machine and clean the ironing roll with a vacuum cleaner before allowing the machine to warm up. Remove all dust from the ironer. Do not use any explosive products. 3.
  • Page 19 5. Electrical connection. Compare the type of main voltage with the data on the machine plate and bear the guidelines in mind. It is important for the electrical connection to be set up by an qualified or certified technician to ensure that the installation complies with the standards and guidelines that apply where the machine is installed.
  • Page 20 Open the electrical cabinet and push on contactor K31 (suction roll ) Check the rotation from the motor motor Manual Version V1.00.6 Adjustments still possible...
  • Page 21 When the Ironer is installed together with a folder, then both machines must be able to be switched off by 1 main switch. Ironer Folder Main Main switch switch Electrical connection cable. Main switch in room. Differential 6. Gas connection Compare the type of gas (natural gas, propane) with the data on the machine and bear the guidelines in mind.
  • Page 22 When using modulating burner BS3/BS4 you have to install this gas filter for separation of dirt and dust particles from the gas installation. If you don’t use this filter you can have problems with the gas valve. We deliver the filter when you have a modulating burner. 7.
  • Page 23 example 150 mm instead of 125 mm. Insulate both the gas and exhaust outlet pipes to prevent fire. See chapter 1.3 for amount of m³/h air for exhaust outlet and gas outlet. Note : Failure to comply with the installation guidelines may lead to counter-pressure in the outlet channel which will impair output and quality.
  • Page 24 Dismantle the protective plate at the back. Allow the machine to warm up (adjust the temperature setting to 175°) and press start and at the same time press against the finger guard so that the bed closes and the roll does not turn.
  • Page 25 10. Install the supplied foot pedal (optional). Position the footplate on the frame. Manual Version V1.00.6 Adjustments still possible...
  • Page 26 11. Burner adjustment. First check if the burner is still mounted correctly on the heat exchanger. It can be possible that the burner gets loose because of transport. Good Manual Version V1.00.6 Adjustments still possible...
  • Page 27 Wrong On startup of the machine on location, burner settings have to be adjusted by an qualified or certified technician and be inspected on standards in the concerned region. Before starting the burner, it is necessary to read the enclosed manual of the burner and the gas valve.
  • Page 28 12. Removing air from the thermal oil system. Gas heated: The heating system must be fully bled the first time the machine is warmed up. This bleeding is done by connecting the supplied teflon hose onto the copper pipe on top of the expansion tank next to the circulation pump.
  • Page 29  15min. on 90°C  15min. on 100°C  15min. on 110°C  15min. on 120°C  15min. on 140°C  15min. on 160°C  15min. on 175°C When the temperature is reached (175°c ) you have to wait 15 minutes before you can removed the Teflon hose.
  • Page 30 Check if all the emergency stop buttons and finger screen protection work. Finger screen protection: Manual Version V1.00.6 Adjustments still possible...
  • Page 31 Contact finger guard Manual Version V1.00.6 Adjustments still possible...
  • Page 32: General

    Should not exceed 15mm!!! Contact finger guard 1.5 General. The service life of an ironing machine with a steel ironing bed is approximately 15 years with normal maintenance. This is an estimate. It is not binding. No compensation may be claimed for a shorter service life. Noise level: 60-65 db depending on speed.
  • Page 33 ATTENTION !!! Manual Version V1.00.6 Adjustments still possible...
  • Page 34 Before starting up the machine, check the direction of rotation of: - The fan motor - The hydraulic pump motor - The circulation pump motor Manual Version V1.00.6 Adjustments still possible...
  • Page 35 Electrolux Professional AB 341 80 Ljungby, Sweden www.electroluxprofessional.com Manual Version V1.00.6 Adjustments still possible...